天天干天天操天天射_蜜桃网址_japanxxxvideo_97久久人人爽人人爽人人

EN
The flue gas cleaning project of the Yuanyang waste incineration power generation project in Xinxiang City, Henan Province, undertaken by Huaxing East Co., passed the 72+24 hours trial operation
2024.01.18
The flue gas cleaning project of the Yuanyang waste incineration power generation project in Xinxiang City, Henan Province, undertaken by our company, passed the 72+24 hour trial operation on January 11, 2022.
The project has a designed daily domestic waste processing capacity of 600t/d, a 1×600t/d waste incinerator production line, and a 1×15MW steam turbine generator unit. The flue gas treatment adopts the flue gas cleaning combination process of "semi-dry method (rotary atomization semi-dry reaction tower) + dry method (slaked lime injection) + activated carbon injection + bag dust collector", which is the equipment supply project for our company.
Huaxing East Co's performance in Henan Province includes: Pingdingshan Yexian, Pingdingshan Baofeng, Zhoukou Luyi, Zhoukou Xihua, Zhoukou Dancheng, Shangqiu, Puyang, Zhumadian Zhengyang, Zhumadian Shangcai, Dengzhou, Anyang Linzhou, Nanyang Tanghe, Zhengzhou South,  Zhengzhou Gongyi, Zhengzhou Gongyi Yulian Industrial Park, Luoyang Yanshi, Luoyang Yiyang, Xinxiang Yuanyang, Xinxiang Fengqiu, Xinxiang Huojia and other projects.

Click or scan below for more information!

Follow us!