天天干天天操天天射_蜜桃网址_japanxxxvideo_97久久人人爽人人爽人人

EN
The flue gas cleaning (FGC) project undertaken by Huaxing-east for the waste incineration power plant in Huludao, Liaoning has passed 72+24 hours of trial operation
2023.05.29
The flue gas cleaning (FGC) project undertaken by Huaxing-east for the waste incineration power plant in Huludao, Liaoning has passed 72+24 hours of trial operation on May 8, 2023.
The plant process capacity is 1200 t/d, equiped with 2×600 t/d mechanical grate and 1×25 MW medium temperature and pressure condensing steam turbine. The FGC process applied "semi-dry rotary spray absorber + dry injection of calcium hydroxide + activated carbon injection + bag filter + fly ash conveying and storage". It's an EPC project of Huaxing.
Huaxing-east's performances in Liaoning Province include Tiexi in Shenyang, Kangping in Shenyang, Zhuanghe in Dalian, Haicheng in Anshan, Huludao, and Lingyuan in Chaoyang.
Click to enter!
Take you to explore - Huaxing East

Professional equipment supplier and system integrator in the field of flue gas cleaning (FGC)